{"id":1,"date":"2018-05-15T10:33:34","date_gmt":"2018-05-15T14:33:34","guid":{"rendered":"https:\/\/www.est-aegis.com\/?p=1"},"modified":"2026-10-22T14:52:10","modified_gmt":"2026-10-22T18:52:10","slug":"15-costs-you-can-avoid-in-your-facility","status":"publish","type":"post","link":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/","title":{"rendered":"Facility Managers Know:\u00a0 Motor Downtime is Disruptive and Expensive!"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In any facility, when electric motors fail, the costs can be very high.\u00a0 In any maintenance department, cost avoidance is key to running an efficient and smooth operation.\u00a0 Minimizing disruptions by selecting the right electric motors and accessories is one way to avoid some of these these expensive downtime costs.\u00a0 For example, when an electric motor is controlled by a variable frequency drive (VFD), voltages can be capacitively induced onto the motor&#8217;s shaft.\u00a0 This results in pitted and fluted bearings and burnt lubrication.\u00a0 This destructive process results in up to a 90% decreased service life of the electric motor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.est-aegis.com\/bearing-protection-bearing-currents.php\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" class=\"aligncenter wp-image-191 size-medium\" height=\"267\" src=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png\" width=\"300\"><\/a> Shaft Voltage Discharge Cycle<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A motor that should last 60,000 hours may only last for 6000 unless a motor with a shaft grounding ring is used, with the ring either factory-installed or retrofitted in the field.\u00a0 Most electric motor manufacturers have full product lines of motors with <a href=\"https:\/\/www.est-aegis.com\/where-to-buy\/oems-with-aegis\/\" rel=\"noopener\" target=\"_blank\">AEGIS<sup>\u00ae<\/sup> shaft grounding rings factory installed<\/a> including ABB, WEG, TECO, Marathon Electric, and LEESON.\u00a0 Most will also install them as retrofits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Whenever a motor is sent to a repair shop, an AEGIS ring may be easily installed during the repair.\u00a0 Alternately, field install kits allow maintenance departments to install AEGIS rings on their own motors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The key is to ensure that any motor operated by a VFD has bearing protection, whether it&#8217;s built-in or added aftermarket, <em>by specifying it ahead of time<\/em>.\u00a0 What many facility managers and chief engineers do is to add this requirement to their purchasing specification.\u00a0 By doing this the purchasing department will look for the AEGIS shaft grounding ring brand when they make their purchasing decisions.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Here are 15 costs that can be avoided when motors with AEGIS shaft grounding rings are specified:<\/h4>\n\n\n\n<ol class=\"wp-block-list\">\n\n<li>Hourly rate of the people who must decouple the motor and remove it from the system.\u00a0 This cost can be quite high especially if the motor requires special lifting or rigging equipment and is in a difficult place to reach.\u00a0 Hundreds of dollars in labor alone can be avoided.<\/li>\n\n\n<li>Any special rigging equipment to lift\/transport the motor.\u00a0 This equipment must either be purchased or rented.\u00a0 Even a relatively small 10 HP motor weighs over 250 lbs requiring special rigging equipment.\u00a0 As the motor gets heavier and larger the equipment also gets much more costly.<\/li>\n\n\n<li>Management time costs money in more than one way.\u00a0 First, it takes the manager away from other important activities, and second, they must spend time on the problem.\u00a0 The hourly rate of management spending time on the problem can be avoided.<\/li>\n\n\n<li>Customer service of the facility must take time to notify customers of interruptions in operation. In class, A offices, hospitals, labs, universities, and production facilities, taking time to notify and assist internal and external customers is costly.<\/li>\n\n\n<li>The hourly rate of any administrative time needed to find a replacement motor to purchase.\u00a0 Making calls, finding the correct motor, scheduling the receivable, and more, all take time, which must be paid.<\/li>\n\n\n<li>Spare motors are sometimes kept on-site or off-site.\u00a0 Inventory costs are expensive and add to the facility&#8217;s budget.<\/li>\n\n\n<li>Transit costs for the replacement motor when ordered or repaired.\u00a0 Transportation is not free and the bigger the motor, the higher the cost.\u00a0 Expediting when needed adds to the job.<\/li>\n\n\n<li>Receiving costs when motor arrives and is stored.\u00a0 It takes both people&#8217;s time and inventory space to receive and store the replacement motor and any equipment needed to replace it.<\/li>\n\n\n<li>Administrative time to inventory and update records.\u00a0 New serial numbers must be tracked, paperwork filled out, and systems updated.<\/li>\n\n\n<li>Hourly cost of people re-installing the motor.\u00a0 As with removal many hours are consumed in re-installing the motor.\u00a0 Costs increase as the size and difficulty increases.<\/li>\n\n\n<li>Any lifting or rigging equipment needed to transport\/replace the motor.\u00a0 Just like before this equipment must be rented or owned.<\/li>\n\n\n<li>Alignment and testing of new motor.\u00a0 Some systems are simpler than others, but whether the motor is coupled or drive belts are used, laser alignment, vibration testing, and so on add significant cost to the motor installation.<\/li>\n\n\n<li>Disposal cost of the old motor:\u00a0 It must be stored and disposed of, and even if there is a residual scrap value, that seldom covers the cost.<\/li>\n\n\n<li>PRODUCTION DOWNTIME!\u00a0 Here is a highly variable cost.\u00a0 In a production line the hourly downtime cost can be tens of thousands of dollars.\u00a0 Some processes can run into the millions.\u00a0 If space cannot be used, or hospital beds are left unoccupied, or lab experiments interrupted&#8230;\u00a0 You get the idea.<\/li>\n\n\n<li>The actual cost of the replacement motor.\u00a0 Here again, the bigger the motor, the higher the cost!<\/li>\n\n<\/ol>\n\n","protected":false},"excerpt":{"rendered":"<p>15 Costs You Can Avoid in Your Facility<\/p>\n","protected":false},"author":7,"featured_media":9424,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[1069],"tags":[],"class_list":["post-1","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cost-and-reliability"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"15 Costs You Can Avoid in Your Facility\" \/>\n\t<meta name=\"robots\" content=\"noindex, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"author\" content=\"AEGIS\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"de_DE\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Electro Static Technology\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Facility Managers Know: Motor Downtime is Disruptive and Expensive!\" \/>\n\t\t<meta property=\"og:description\" content=\"15 Costs You Can Avoid in Your Facility\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t\t<meta property=\"og:image:height\" content=\"267\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2018-05-15T14:33:34+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-22T18:52:10+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@AEGIS_rings\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Facility Managers Know: Motor Downtime is Disruptive and Expensive!\" \/>\n\t\t<meta name=\"twitter:description\" content=\"15 Costs You Can Avoid in Your Facility\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@AEGIS_rings\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png\" \/>\n\t\t<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t\t<meta name=\"twitter:data1\" content=\"AEGIS\" \/>\n\t\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesedauer\" \/>\n\t\t<meta name=\"twitter:data2\" content=\"4 Minuten\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#article\",\"name\":\"Facility Managers Know: Motor Downtime is Disruptive and Expensive!\",\"headline\":\"Facility Managers Know:\\u00a0 Motor Downtime is Disruptive and Expensive!\",\"author\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/pg10_2-300x267-3.png\",\"width\":300,\"height\":267,\"caption\":\"#image_title\"},\"datePublished\":\"2018-05-15T10:33:34-04:00\",\"dateModified\":\"2026-10-22T14:52:10-04:00\",\"inLanguage\":\"de-DE\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#webpage\"},\"articleSection\":\"Cost &amp; Reliability, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/category\\\/cost-and-reliability\\\/#listItem\",\"name\":\"Cost &amp; Reliability\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/category\\\/cost-and-reliability\\\/#listItem\",\"position\":2,\"name\":\"Cost &amp; Reliability\",\"item\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/category\\\/cost-and-reliability\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#listItem\",\"name\":\"Facility Managers Know:\\u00a0 Motor Downtime is Disruptive and Expensive!\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#listItem\",\"position\":3,\"name\":\"Facility Managers Know:\\u00a0 Motor Downtime is Disruptive and Expensive!\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/category\\\/cost-and-reliability\\\/#listItem\",\"name\":\"Cost &amp; Reliability\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#organization\",\"name\":\"Electro Static Technology\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/logo-aegis-1.svg\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#organizationLogo\",\"width\":244,\"height\":73,\"caption\":\"aegis logo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/AEGIS_rings\"],\"address\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#postaladdress\",\"@type\":\"PostalAddress\",\"streetAddress\":\"31 Winterbrook Road\",\"postalCode\":\"04256\",\"addressLocality\":\"Mechanic Falls\",\"addressRegion\":\"ME\",\"addressCountry\":\"US\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/#author\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/\",\"name\":\"AEGIS\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8df5575541df78c551aa899db7bd2ee11bed27caea7dcd8c7695af230c7c1a04?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"AEGIS\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#webpage\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/\",\"name\":\"Facility Managers Know: Motor Downtime is Disruptive and Expensive!\",\"description\":\"15 Costs You Can Avoid in Your Facility\",\"inLanguage\":\"de-DE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/pg10_2-300x267-3.png\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#mainImage\",\"width\":300,\"height\":267,\"caption\":\"#image_title\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/15-costs-you-can-avoid-in-your-facility\\\/#mainImage\"},\"datePublished\":\"2018-05-15T10:33:34-04:00\",\"dateModified\":\"2026-10-22T14:52:10-04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/\",\"name\":\"Electro Static Technology\",\"inLanguage\":\"de-DE\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Facility Managers Know: Motor Downtime is Disruptive and Expensive!<\/title>\n\n","aioseo_head_json":{"title":"Facility Managers Know: Motor Downtime is Disruptive and Expensive!","description":"15 Costs You Can Avoid in Your Facility","canonical_url":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/","robots":"noindex, max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#article","name":"Facility Managers Know: Motor Downtime is Disruptive and Expensive!","headline":"Facility Managers Know:\u00a0 Motor Downtime is Disruptive and Expensive!","author":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/#author"},"publisher":{"@id":"https:\/\/www.est-aegis.com\/de\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png","width":300,"height":267,"caption":"#image_title"},"datePublished":"2018-05-15T10:33:34-04:00","dateModified":"2026-10-22T14:52:10-04:00","inLanguage":"de-DE","mainEntityOfPage":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#webpage"},"isPartOf":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#webpage"},"articleSection":"Cost &amp; Reliability, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/#listItem","position":1,"name":"Home","item":"https:\/\/www.est-aegis.com\/de\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/#listItem","name":"Cost &amp; Reliability"}},{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/#listItem","position":2,"name":"Cost &amp; Reliability","item":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#listItem","name":"Facility Managers Know:\u00a0 Motor Downtime is Disruptive and Expensive!"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#listItem","position":3,"name":"Facility Managers Know:\u00a0 Motor Downtime is Disruptive and Expensive!","previousItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/#listItem","name":"Cost &amp; Reliability"}}]},{"@type":"Organization","@id":"https:\/\/www.est-aegis.com\/de\/#organization","name":"Electro Static Technology","url":"https:\/\/www.est-aegis.com\/de\/","logo":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/logo-aegis-1.svg","@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#organizationLogo","width":244,"height":73,"caption":"aegis logo"},"image":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#organizationLogo"},"sameAs":["https:\/\/x.com\/AEGIS_rings"],"address":{"@id":"https:\/\/www.est-aegis.com\/de\/#postaladdress","@type":"PostalAddress","streetAddress":"31 Winterbrook Road","postalCode":"04256","addressLocality":"Mechanic Falls","addressRegion":"ME","addressCountry":"US"}},{"@type":"Person","@id":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/#author","url":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/","name":"AEGIS","image":{"@type":"ImageObject","@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8df5575541df78c551aa899db7bd2ee11bed27caea7dcd8c7695af230c7c1a04?s=96&d=mm&r=g","width":96,"height":96,"caption":"AEGIS"}},{"@type":"WebPage","@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#webpage","url":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/","name":"Facility Managers Know: Motor Downtime is Disruptive and Expensive!","description":"15 Costs You Can Avoid in Your Facility","inLanguage":"de-DE","isPartOf":{"@id":"https:\/\/www.est-aegis.com\/de\/#website"},"breadcrumb":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#breadcrumblist"},"author":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/#author"},"creator":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png","@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#mainImage","width":300,"height":267,"caption":"#image_title"},"primaryImageOfPage":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/#mainImage"},"datePublished":"2018-05-15T10:33:34-04:00","dateModified":"2026-10-22T14:52:10-04:00"},{"@type":"WebSite","@id":"https:\/\/www.est-aegis.com\/de\/#website","url":"https:\/\/www.est-aegis.com\/de\/","name":"Electro Static Technology","inLanguage":"de-DE","publisher":{"@id":"https:\/\/www.est-aegis.com\/de\/#organization"}}]},"og:locale":"de_DE","og:site_name":"Electro Static Technology","og:type":"article","og:title":"Facility Managers Know: Motor Downtime is Disruptive and Expensive!","og:description":"15 Costs You Can Avoid in Your Facility","og:url":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/","og:image":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png","og:image:secure_url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png","og:image:width":300,"og:image:height":267,"article:published_time":"2018-05-15T14:33:34+00:00","article:modified_time":"2026-10-22T18:52:10+00:00","twitter:card":"summary_large_image","twitter:site":"@AEGIS_rings","twitter:title":"Facility Managers Know: Motor Downtime is Disruptive and Expensive!","twitter:description":"15 Costs You Can Avoid in Your Facility","twitter:creator":"@AEGIS_rings","twitter:image":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png","twitter:label1":"Verfasst von","twitter:data1":"AEGIS","twitter:label2":"Gesch\u00e4tzte Lesedauer","twitter:data2":"4 Minuten"},"aioseo_meta_data":{"post_id":"1","title":"Facility Managers Know:\u00a0 Motor Downtime is Disruptive and Expensive!","description":"15 Costs You Can Avoid in Your Facility","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-11-04 18:38:33","breadcrumb_settings":null,"limit_modified_date":false,"reviewed_by":null,"open_ai":null,"ai":null,"created":"2026-10-22 16:13:28","updated":"2026-11-16 20:09:00","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.est-aegis.com\/de\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/\" title=\"Cost &amp; Reliability\">Cost &amp; Reliability<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tFacility Managers Know:  Motor Downtime is Disruptive and Expensive!\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.est-aegis.com\/de\/"},{"label":"Cost &amp; Reliability","link":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/"},{"label":"Facility Managers Know:\u00a0 Motor Downtime is Disruptive and Expensive!","link":"https:\/\/www.est-aegis.com\/de\/blog\/15-costs-you-can-avoid-in-your-facility\/"}],"jetpack_featured_media_url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/pg10_2-300x267-3.png","_links":{"self":[{"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/posts\/1","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/comments?post=1"}],"version-history":[{"count":2,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/posts\/1\/revisions"}],"predecessor-version":[{"id":10584,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/posts\/1\/revisions\/10584"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/media\/9424"}],"wp:attachment":[{"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/media?parent=1"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/categories?post=1"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/tags?post=1"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}