{"id":10204,"date":"2023-11-08T09:00:00","date_gmt":"2023-11-08T14:00:00","guid":{"rendered":"https:\/\/www.est-aegis.com\/?p=179"},"modified":"2026-10-22T15:00:45","modified_gmt":"2026-10-22T19:00:45","slug":"the-cost-of-unplanned-production-downtime","status":"publish","type":"post","link":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/","title":{"rendered":"The Cost of Unplanned Production Downtime"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright\" alt=\"plant-stopped-public-domain-pictures-1494264330MSQ\" height=\"200\" src=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg\" width=\"300\">In manufacturing, unplanned downtime costs are huge and only getting more significant. According to <a href=\"https:\/\/assets.new.siemens.com\/siemens\/assets\/api\/uuid:3d606495-dbe0-43e4-80b1-d04e27ada920\/dics-b10153-00-7600truecostofdowntime2022-144.pdf\" rel=\"noopener\" target=\"_blank\">a recent study<\/a> of 72 large companies by <a href=\"https:\/\/www.siemens.com\/global\/en\/products\/services\/digital-enterprise-services\/analytics-artificial-intelligence-services\/predictive-services\/senseye-predictive-maintenance.html\" rel=\"noopener\" target=\"_blank\">Senseye Predictive Maintenance<\/a>, large plants&#8216; costs of unplanned downtime average $532,000 <span style=\"text-decoration: underline;\">per hour<\/span>. The study cites the disturbing figure that downtime costs these companies 11% of their annual revenue in 2022, up from 8% in 2020.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><br>What Are Manufacturers Doing to Mitigate Unexpected Downtime?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">It goes without saying that manufacturers do all they can to minimize unplanned downtime. There are many components to a downtime mitigation strategy, ranging from beefing up maintenance programs to investing in protective products to make manufacturing systems as reliable as possible.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><br>Protecting Motor Bearings From Damage by VFDs<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One step in this direction is to protect electric motor bearings against the damage caused by variable frequency drive (VFD) control. VFDs generate high-frequency voltage on the shafts of the motors they control. Without protection, this so-called shaft voltage will discharge through the motor or system bearings, causing electrical damage, eventual premature failure, and potentially unplanned downtime.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><br>A Reliable Strategy: Shaft Grounding Ring<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">One protective product is the <a href=\"https:\/\/www.est-aegis.com\/product\/sgr\/\" rel=\"noopener\">AEGIS<sup>\u00ae<\/sup> Shaft Grounding Ring<\/a>. AEGIS rings provide a low resistance path to charge on the shaft and bleed down the shaft voltage to levels too low to arc through the bearings, protecting them from discharge damage. When protected by AEGIS rings, VFD-controlled systems are less likely to fail prematurely, and one risk of unplanned downtime is thus mitigated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While AEGIS rings alone cannot prevent every motor failure, they are an important part of the overall reliability strategy for every plant that uses VFDs for motor control.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AEGIS Rings also come with a <a href=\"https:\/\/www.est-aegis.com\/product\/extended-warranty\/\" rel=\"noopener\" target=\"_blank\">2-year extended warranty<\/a> against bearing fluting damage. No other form of protection against VFD-caused bearing damage offers a warranty like this.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To learn more about AEGIS shaft grounding and best practices for electrical bearing protection, <a href=\"https:\/\/www.est-aegis.com\/resources\/training\/\" rel=\"noopener\" target=\"_blank\">sign up for a training<\/a>. We offer monthly live training webinars, and &#8211; pandemic restrictions permitting &#8211; we can also visit your facility to review your exact application.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-fe48e5de wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.est-aegis.com\/resources\/training\/\">Sign Up For Training<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">FAQ<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">Q1. What are other causes of unplanned downtime, not involving VFDs?<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">A1. Not all bearing failure is caused by VFDs.\u00a0 Contamination (in unsealed bearings) is a common cause of failure.\u00a0 Other system components can also fail.\u00a0 Often, the cause is human error &#8211; misalignment of components, errors in control programming, and failure to notice or respond to small problems that spiral.\u00a0 Supply chain disruptions and unpredictable events like power outages and extreme weather also contribute to unplanned downtime.\u00a0 The key to minimizing unplanned downtime is to focus on what <em>can<\/em> be predicted or protected against.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">Q2. How effective at preventing bearing failure are AEGIS rings?<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">A2. When installed properly, AEGIS rings effectively lower shaft voltage, protecting against bearing failure due to electrical damage, and reducing the total risk of unplanned downtime.\u00a0 However, they do not protect against circulating bearing current in larger motors (over 100 hp\/75 kW) &#8211; For circulating current, you need either bearing insulation or VFD output filters to mitigate damage.\u00a0 And AEGIS rings &#8211; or any electrical bearing protection &#8211; cannot prevent bearing failure due to non-electrical damage like excessive vibration from misalignment.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">\u00a0Q3. What <span>other strategies or protective measures besides AEGIS rings can manufacturing plants employ to mitigate the risk of unplanned downtime related to VFD-controlled systems?<\/span><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\"><span>A3. Besides AEGIS rings, other protective measures may include: regular equipment inspections and maintenance, implementing condition monitoring and predictive maintenance programs, investing in high-quality VFDs with built-in protective features, using proper grounding and bonding techniques, and providing comprehensive training for operators and maintenance staff to ensure proper handling and troubleshooting of VFD-related issues.\u00a0 Combining multiple layers of protection and proactive maintenance practices enhances the reliability and resilience of manufacturing systems against unplanned downtime.<\/span><\/span><\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>According to a recent study, unplanned downtime can cost up to 11% of total revenue.  One way to reduce downtime is with AEGIS Shaft Grounding Rings.<\/p>\n","protected":false},"author":7,"featured_media":10021,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[1069],"tags":[],"class_list":["post-10204","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cost-and-reliability"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.\" \/>\n\t<meta name=\"robots\" content=\"noindex, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"author\" content=\"AEGIS\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"de_DE\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Electro Static Technology\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"What is the Cost of Downtime in Manufacturing?\" \/>\n\t\t<meta property=\"og:description\" content=\"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-11-08T14:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-22T19:00:45+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@AEGIS_rings\" \/>\n\t\t<meta name=\"twitter:title\" content=\"What is the Cost of Downtime in Manufacturing?\" \/>\n\t\t<meta name=\"twitter:description\" content=\"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@AEGIS_rings\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg\" \/>\n\t\t<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t\t<meta name=\"twitter:data1\" content=\"AEGIS\" \/>\n\t\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesedauer\" \/>\n\t\t<meta name=\"twitter:data2\" content=\"3 Minuten\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#article\",\"name\":\"What is the Cost of Downtime in Manufacturing?\",\"headline\":\"The Cost of Unplanned Production Downtime\",\"author\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"#image_title\"},\"datePublished\":\"2023-11-08T09:00:00-05:00\",\"dateModified\":\"2026-10-22T15:00:45-04:00\",\"inLanguage\":\"de-DE\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#webpage\"},\"articleSection\":\"Cost &amp; Reliability, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/category\\\/cost-and-reliability\\\/#listItem\",\"name\":\"Cost &amp; Reliability\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/category\\\/cost-and-reliability\\\/#listItem\",\"position\":2,\"name\":\"Cost &amp; Reliability\",\"item\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/category\\\/cost-and-reliability\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#listItem\",\"name\":\"The Cost of Unplanned Production Downtime\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#listItem\",\"position\":3,\"name\":\"The Cost of Unplanned Production Downtime\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/category\\\/cost-and-reliability\\\/#listItem\",\"name\":\"Cost &amp; Reliability\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#organization\",\"name\":\"Electro Static Technology\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/logo-aegis-1.svg\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#organizationLogo\",\"width\":244,\"height\":73,\"caption\":\"aegis logo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/AEGIS_rings\"],\"address\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#postaladdress\",\"@type\":\"PostalAddress\",\"streetAddress\":\"31 Winterbrook Road\",\"postalCode\":\"04256\",\"addressLocality\":\"Mechanic Falls\",\"addressRegion\":\"ME\",\"addressCountry\":\"US\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/#author\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/\",\"name\":\"AEGIS\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8df5575541df78c551aa899db7bd2ee11bed27caea7dcd8c7695af230c7c1a04?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"AEGIS\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#webpage\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/\",\"name\":\"What is the Cost of Downtime in Manufacturing?\",\"description\":\"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.\",\"inLanguage\":\"de-DE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/author\\\/aegis\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#mainImage\",\"width\":1920,\"height\":1280,\"caption\":\"#image_title\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/blog\\\/the-cost-of-unplanned-production-downtime\\\/#mainImage\"},\"datePublished\":\"2023-11-08T09:00:00-05:00\",\"dateModified\":\"2026-10-22T15:00:45-04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/\",\"name\":\"Electro Static Technology\",\"inLanguage\":\"de-DE\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/de\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>What is the Cost of Downtime in Manufacturing?<\/title>\n\n","aioseo_head_json":{"title":"What is the Cost of Downtime in Manufacturing?","description":"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.","canonical_url":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/","robots":"noindex, max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#article","name":"What is the Cost of Downtime in Manufacturing?","headline":"The Cost of Unplanned Production Downtime","author":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/#author"},"publisher":{"@id":"https:\/\/www.est-aegis.com\/de\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg","width":1920,"height":1280,"caption":"#image_title"},"datePublished":"2023-11-08T09:00:00-05:00","dateModified":"2026-10-22T15:00:45-04:00","inLanguage":"de-DE","mainEntityOfPage":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#webpage"},"isPartOf":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#webpage"},"articleSection":"Cost &amp; Reliability, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/#listItem","position":1,"name":"Home","item":"https:\/\/www.est-aegis.com\/de\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/#listItem","name":"Cost &amp; Reliability"}},{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/#listItem","position":2,"name":"Cost &amp; Reliability","item":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#listItem","name":"The Cost of Unplanned Production Downtime"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#listItem","position":3,"name":"The Cost of Unplanned Production Downtime","previousItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/#listItem","name":"Cost &amp; Reliability"}}]},{"@type":"Organization","@id":"https:\/\/www.est-aegis.com\/de\/#organization","name":"Electro Static Technology","url":"https:\/\/www.est-aegis.com\/de\/","logo":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/logo-aegis-1.svg","@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#organizationLogo","width":244,"height":73,"caption":"aegis logo"},"image":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#organizationLogo"},"sameAs":["https:\/\/x.com\/AEGIS_rings"],"address":{"@id":"https:\/\/www.est-aegis.com\/de\/#postaladdress","@type":"PostalAddress","streetAddress":"31 Winterbrook Road","postalCode":"04256","addressLocality":"Mechanic Falls","addressRegion":"ME","addressCountry":"US"}},{"@type":"Person","@id":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/#author","url":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/","name":"AEGIS","image":{"@type":"ImageObject","@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8df5575541df78c551aa899db7bd2ee11bed27caea7dcd8c7695af230c7c1a04?s=96&d=mm&r=g","width":96,"height":96,"caption":"AEGIS"}},{"@type":"WebPage","@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#webpage","url":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/","name":"What is the Cost of Downtime in Manufacturing?","description":"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.","inLanguage":"de-DE","isPartOf":{"@id":"https:\/\/www.est-aegis.com\/de\/#website"},"breadcrumb":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#breadcrumblist"},"author":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/#author"},"creator":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/author\/aegis\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg","@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#mainImage","width":1920,"height":1280,"caption":"#image_title"},"primaryImageOfPage":{"@id":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/#mainImage"},"datePublished":"2023-11-08T09:00:00-05:00","dateModified":"2026-10-22T15:00:45-04:00"},{"@type":"WebSite","@id":"https:\/\/www.est-aegis.com\/de\/#website","url":"https:\/\/www.est-aegis.com\/de\/","name":"Electro Static Technology","inLanguage":"de-DE","publisher":{"@id":"https:\/\/www.est-aegis.com\/de\/#organization"}}]},"og:locale":"de_DE","og:site_name":"Electro Static Technology","og:type":"article","og:title":"What is the Cost of Downtime in Manufacturing?","og:description":"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.","og:url":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/","og:image":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg","og:image:secure_url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg","og:image:width":1920,"og:image:height":1280,"article:published_time":"2023-11-08T14:00:00+00:00","article:modified_time":"2026-10-22T19:00:45+00:00","twitter:card":"summary_large_image","twitter:site":"@AEGIS_rings","twitter:title":"What is the Cost of Downtime in Manufacturing?","twitter:description":"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.","twitter:creator":"@AEGIS_rings","twitter:image":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg","twitter:label1":"Verfasst von","twitter:data1":"AEGIS","twitter:label2":"Gesch\u00e4tzte Lesedauer","twitter:data2":"3 Minuten"},"aioseo_meta_data":{"post_id":"10204","title":"What is the Cost of Downtime in Manufacturing?","description":"According to a recent study, unplanned downtime can cost up to 11% of total revenue. One way to reduce downtime is with AEGIS Shaft Grounding Rings.","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-10-28 18:15:41","breadcrumb_settings":null,"limit_modified_date":false,"reviewed_by":null,"open_ai":null,"ai":null,"created":"2026-10-22 16:14:14","updated":"2026-11-16 21:34:14","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.est-aegis.com\/de\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/\" title=\"Cost &amp; Reliability\">Cost &amp; Reliability<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tThe Cost of Unplanned Production Downtime\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.est-aegis.com\/de\/"},{"label":"Cost &amp; Reliability","link":"https:\/\/www.est-aegis.com\/de\/blog\/category\/cost-and-reliability\/"},{"label":"The Cost of Unplanned Production Downtime","link":"https:\/\/www.est-aegis.com\/de\/blog\/the-cost-of-unplanned-production-downtime\/"}],"jetpack_featured_media_url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/plant-stopped-public-domain-pictures-1494264330MSQ.jpg","_links":{"self":[{"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/posts\/10204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/comments?post=10204"}],"version-history":[{"count":3,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/posts\/10204\/revisions"}],"predecessor-version":[{"id":10668,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/posts\/10204\/revisions\/10668"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/media\/10021"}],"wp:attachment":[{"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/media?parent=10204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/categories?post=10204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.est-aegis.com\/de\/wp-json\/wp\/v2\/tags?post=10204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}