{"id":10163,"date":"2022-09-07T13:29:58","date_gmt":"2022-09-07T17:29:58","guid":{"rendered":"https:\/\/www.est-aegis.com\/?p=72"},"modified":"2026-10-22T15:00:55","modified_gmt":"2026-10-22T19:00:55","slug":"electrical-bearing-protection-qa-part-27","status":"publish","type":"post","link":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/","title":{"rendered":"Electrical Bearing Protection Q&#038;A &#8211; Part 27"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Q1.\u00a0 Should we put a shaft grounding ring on the driven equipment as well, or is a motor grounding ring sufficient?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A1.<\/strong>\u00a0 A shaft grounding ring on the motor is usually enough.\u00a0 Say the motor is driving a gearbox.\u00a0 If you put a shaft grounding ring on the motor, it should bleed off the vast majority of voltage on the shaft.\u00a0 You do need to make sure the shaft grounding is sufficient:\u00a0 If the motors are larger than a few hundred hp (kW), or run on more than 600V, you need a PRO ring rather than an SGR.\u00a0 It&rsquo;s also always a good idea to bond the motor frame and the load frame with a high-frequency grounding strap.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Q2.\u00a0 What if you use ceramic or hybrid bearings at both ends?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A2.<span style=\"font-weight: normal;\">\u00a0 That will protect the motor bearings from electrical damage just fine.\u00a0 But there will still be a capacitive voltage on the shaft, and that voltage will discharge if it can.\u00a0 So whatever machine the motor is driving will be at risk.<img decoding=\"async\" class=\"alignright\" alt=\"gearbox-1\" src=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg\" width=\"450\"><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">We had a paper mill customer that was losing bearings regularly.\u00a0 Someone from a bearing distributor told them they should install hybrid bearings.\u00a0 They did, and after that, the motors were fine&#8230; but the gearboxes those motors were driving started taking damage.\u00a0 Eventually, they installed AEGIS rings on the motors, and the gearboxes have been fine since.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">So even if both motor bearings are insulated, you should still use shaft grounding to protect the driven equipment&rsquo;s bearings.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Q3.\u00a0 Why do we mount shaft grounding rings on only one end of the motor?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A3.<span style=\"font-weight: normal;\">\u00a0 You might think that if one ring is good, two rings are better, one at each end.\u00a0 It turns out that&rsquo;s overkill, at best.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">Small motors under 100 hp (75 kW), only need one SGR.\u00a0 A second wouldn&rsquo;t hurt them, but it won&rsquo;t help.\u00a0 Once you make the electrical connection with a grounding ring at one end, the entire shaft is basically neutralized.\u00a0 Adding another point of electrical contact doesn&rsquo;t make much difference.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">For larger motors, over 100 hp, it can actually worsen bearing damage from high frequency circulating current.\u00a0 How does that work?\u00a0 We recommend a shaft grounding ring at one end, and interrupting circulating current with an insulated or hybrid bearing at the opposite end.\u00a0 That&rsquo;s like opening a switch in a circuit, as shown in the figure.\u00a0 The bottom is the motor shaft; the top is the frame.\u00a0 The ac source is an inductive voltage on the shaft, the grounding<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">\u00a0ring is the 1\u03a9 resistor, the steel bearing is the 10 k\u03a9 variable resistor, and the ceramic bearing is the open switch.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><img decoding=\"async\" class=\"alignright\" alt=\"Circuit diagrams for motors with one insulated bearing and shaft grounding: One grounding ring (left) and one at each end (right)\" src=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/2-grounding-ring.png\" width=\"450\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">The conductive path is broken, so no current flows.\u00a0 Putting a shaft grounding ring at the end with the insulated bearing is like dropping a paperclip across an open switch:\u00a0 The circuit is complete again, and current can circulate.\u00a0 And some of that circulating current will find its way through the uninsulated bearing and damage it.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: normal;\">Long story short:\u00a0 You only need one grounding ring for any motor, and for larger motors, you also need an insulated bearing opposite the grounding ring.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AEGIS Shaft Grounding Rings have a<span>\u00a0<\/span><a href=\"https:\/\/www.est-aegis.com\/product\/extended-warranty\/\" rel=\"noopener\">2-year extended warranty<\/a><span>\u00a0<\/span>against bearing fluting damage.\u00a0 No other form of shaft grounding offers a warranty like this.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To learn more about AEGIS shaft grounding and best practices for electrical bearing protection,<span>\u00a0<\/span><a href=\"https:\/\/www.est-aegis.com\/resources\/training\/\" rel=\"noopener\">sign up for a training<\/a>.\u00a0 We offer monthly live training webinars, and \u2013 pandemic restrictions permitting \u2013 we can also visit your facility to review your exact application.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-fe48e5de wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.est-aegis.com\/resources\/training\/\">Sign Up For Training<\/a><\/div>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Doubling down:  Do you ever need two shaft grounding rings on a motor system?  And what about motors with two insulated or ceramic bearings?<\/p>\n","protected":false},"author":7,"featured_media":9929,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[1063],"tags":[],"class_list":["post-10163","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-qa-series"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?\" \/>\n\t<meta name=\"robots\" content=\"noindex, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"author\" content=\"AEGIS\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"fr_FR\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Electro Static Technology\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Extra Shaft Grounding | Electrical Bearing Protection Q&amp;A Part 27\" \/>\n\t\t<meta property=\"og:description\" content=\"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"478\" \/>\n\t\t<meta property=\"og:image:height\" content=\"380\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2022-09-07T17:29:58+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-22T19:00:55+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@AEGIS_rings\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Extra Shaft Grounding | Electrical Bearing Protection Q&amp;A Part 27\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@AEGIS_rings\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg\" \/>\n\t\t<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t\t<meta name=\"twitter:data1\" content=\"AEGIS\" \/>\n\t\t<meta name=\"twitter:label2\" content=\"Estimation du temps de lecture\" \/>\n\t\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#article\",\"name\":\"Extra Shaft Grounding | Electrical Bearing Protection Q&A Part 27\",\"headline\":\"Electrical Bearing Protection Q&#038;A &#8211; Part 27\",\"author\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/author\\\/aegis\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/gearbox-1.jpg\",\"width\":478,\"height\":380,\"caption\":\"#image_title\"},\"datePublished\":\"2022-09-07T13:29:58-04:00\",\"dateModified\":\"2026-10-22T15:00:55-04:00\",\"inLanguage\":\"fr-FR\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#webpage\"},\"articleSection\":\"Q&amp;A Series, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/category\\\/qa-series\\\/#listItem\",\"name\":\"Q&amp;A Series\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/category\\\/qa-series\\\/#listItem\",\"position\":2,\"name\":\"Q&amp;A Series\",\"item\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/category\\\/qa-series\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#listItem\",\"name\":\"Electrical Bearing Protection Q&#038;A &#8211; Part 27\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#listItem\",\"position\":3,\"name\":\"Electrical Bearing Protection Q&#038;A &#8211; Part 27\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/category\\\/qa-series\\\/#listItem\",\"name\":\"Q&amp;A Series\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/#organization\",\"name\":\"Electro Static Technology\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/logo-aegis-1.svg\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#organizationLogo\",\"width\":244,\"height\":73,\"caption\":\"aegis logo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/AEGIS_rings\"],\"address\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/#postaladdress\",\"@type\":\"PostalAddress\",\"streetAddress\":\"31 Winterbrook Road\",\"postalCode\":\"04256\",\"addressLocality\":\"Mechanic Falls\",\"addressRegion\":\"ME\",\"addressCountry\":\"US\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/author\\\/aegis\\\/#author\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/author\\\/aegis\\\/\",\"name\":\"AEGIS\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8df5575541df78c551aa899db7bd2ee11bed27caea7dcd8c7695af230c7c1a04?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"AEGIS\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#webpage\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/\",\"name\":\"Extra Shaft Grounding | Electrical Bearing Protection Q&A Part 27\",\"description\":\"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?\",\"inLanguage\":\"fr-FR\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/author\\\/aegis\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/author\\\/aegis\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/wp-content\\\/uploads\\\/gearbox-1.jpg\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#mainImage\",\"width\":478,\"height\":380,\"caption\":\"#image_title\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/blog\\\/electrical-bearing-protection-qa-part-27\\\/#mainImage\"},\"datePublished\":\"2022-09-07T13:29:58-04:00\",\"dateModified\":\"2026-10-22T15:00:55-04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/\",\"name\":\"Electro Static Technology\",\"inLanguage\":\"fr-FR\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.est-aegis.com\\\/fr\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Extra Shaft Grounding | Electrical Bearing Protection Q&amp;A Part 27<\/title>\n\n","aioseo_head_json":{"title":"Extra Shaft Grounding | Electrical Bearing Protection Q&A Part 27","description":"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?","canonical_url":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/","robots":"noindex, max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#article","name":"Extra Shaft Grounding | Electrical Bearing Protection Q&A Part 27","headline":"Electrical Bearing Protection Q&#038;A &#8211; Part 27","author":{"@id":"https:\/\/www.est-aegis.com\/fr\/blog\/author\/aegis\/#author"},"publisher":{"@id":"https:\/\/www.est-aegis.com\/fr\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg","width":478,"height":380,"caption":"#image_title"},"datePublished":"2022-09-07T13:29:58-04:00","dateModified":"2026-10-22T15:00:55-04:00","inLanguage":"fr-FR","mainEntityOfPage":{"@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#webpage"},"isPartOf":{"@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#webpage"},"articleSection":"Q&amp;A Series, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/fr\/#listItem","position":1,"name":"Home","item":"https:\/\/www.est-aegis.com\/fr\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/category\/qa-series\/#listItem","name":"Q&amp;A Series"}},{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/category\/qa-series\/#listItem","position":2,"name":"Q&amp;A Series","item":"https:\/\/www.est-aegis.com\/fr\/blog\/category\/qa-series\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#listItem","name":"Electrical Bearing Protection Q&#038;A &#8211; Part 27"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/fr\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#listItem","position":3,"name":"Electrical Bearing Protection Q&#038;A &#8211; Part 27","previousItem":{"@type":"ListItem","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/category\/qa-series\/#listItem","name":"Q&amp;A Series"}}]},{"@type":"Organization","@id":"https:\/\/www.est-aegis.com\/fr\/#organization","name":"Electro Static Technology","url":"https:\/\/www.est-aegis.com\/fr\/","logo":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/logo-aegis-1.svg","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#organizationLogo","width":244,"height":73,"caption":"aegis logo"},"image":{"@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#organizationLogo"},"sameAs":["https:\/\/x.com\/AEGIS_rings"],"address":{"@id":"https:\/\/www.est-aegis.com\/fr\/#postaladdress","@type":"PostalAddress","streetAddress":"31 Winterbrook Road","postalCode":"04256","addressLocality":"Mechanic Falls","addressRegion":"ME","addressCountry":"US"}},{"@type":"Person","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/author\/aegis\/#author","url":"https:\/\/www.est-aegis.com\/fr\/blog\/author\/aegis\/","name":"AEGIS","image":{"@type":"ImageObject","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8df5575541df78c551aa899db7bd2ee11bed27caea7dcd8c7695af230c7c1a04?s=96&d=mm&r=g","width":96,"height":96,"caption":"AEGIS"}},{"@type":"WebPage","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#webpage","url":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/","name":"Extra Shaft Grounding | Electrical Bearing Protection Q&A Part 27","description":"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?","inLanguage":"fr-FR","isPartOf":{"@id":"https:\/\/www.est-aegis.com\/fr\/#website"},"breadcrumb":{"@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#breadcrumblist"},"author":{"@id":"https:\/\/www.est-aegis.com\/fr\/blog\/author\/aegis\/#author"},"creator":{"@id":"https:\/\/www.est-aegis.com\/fr\/blog\/author\/aegis\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg","@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#mainImage","width":478,"height":380,"caption":"#image_title"},"primaryImageOfPage":{"@id":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/#mainImage"},"datePublished":"2022-09-07T13:29:58-04:00","dateModified":"2026-10-22T15:00:55-04:00"},{"@type":"WebSite","@id":"https:\/\/www.est-aegis.com\/fr\/#website","url":"https:\/\/www.est-aegis.com\/fr\/","name":"Electro Static Technology","inLanguage":"fr-FR","publisher":{"@id":"https:\/\/www.est-aegis.com\/fr\/#organization"}}]},"og:locale":"fr_FR","og:site_name":"Electro Static Technology","og:type":"article","og:title":"Extra Shaft Grounding | Electrical Bearing Protection Q&amp;A Part 27","og:description":"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?","og:url":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/","og:image":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg","og:image:secure_url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg","og:image:width":478,"og:image:height":380,"article:published_time":"2022-09-07T17:29:58+00:00","article:modified_time":"2026-10-22T19:00:55+00:00","twitter:card":"summary_large_image","twitter:site":"@AEGIS_rings","twitter:title":"Extra Shaft Grounding | Electrical Bearing Protection Q&amp;A Part 27","twitter:description":"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?","twitter:creator":"@AEGIS_rings","twitter:image":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg","twitter:label1":"\u00c9crit par","twitter:data1":"AEGIS","twitter:label2":"Estimation du temps de lecture","twitter:data2":"3 minutes"},"aioseo_meta_data":{"post_id":"10163","title":"Extra Shaft Grounding | Electrical Bearing Protection Q&A Part 27","description":"Doubling down: Do you ever need two shaft grounding rings on a motor system? And what about motors with two insulated or ceramic bearings?","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-11-04 18:40:10","breadcrumb_settings":null,"limit_modified_date":false,"reviewed_by":null,"open_ai":null,"ai":null,"created":"2026-10-22 16:13:47","updated":"2026-11-16 21:27:11","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.est-aegis.com\/fr\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.est-aegis.com\/fr\/blog\/category\/qa-series\/\" title=\"Q&amp;A Series\">Q&amp;A Series<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tElectrical Bearing Protection Q&amp;A \u2013 Part 27\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.est-aegis.com\/fr\/"},{"label":"Q&amp;A Series","link":"https:\/\/www.est-aegis.com\/fr\/blog\/category\/qa-series\/"},{"label":"Electrical Bearing Protection Q&#038;A &#8211; Part 27","link":"https:\/\/www.est-aegis.com\/fr\/blog\/electrical-bearing-protection-qa-part-27\/"}],"jetpack_featured_media_url":"https:\/\/www.est-aegis.com\/wp-content\/uploads\/gearbox-1.jpg","_links":{"self":[{"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/posts\/10163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/comments?post=10163"}],"version-history":[{"count":3,"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/posts\/10163\/revisions"}],"predecessor-version":[{"id":10696,"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/posts\/10163\/revisions\/10696"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/media\/9929"}],"wp:attachment":[{"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/media?parent=10163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/categories?post=10163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.est-aegis.com\/fr\/wp-json\/wp\/v2\/tags?post=10163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}